Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'US-92 ' (1) ·
'WARNER CREEK ' (1)
'CR 880 ' (1) ·
'CR-508 (69TH ST.) ' (1) ·
'CR-723 ' (1) ·
'E. CAMINO REAL ' (1) ·
'EB PGA Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'I-95 ' (1) ·
'I-95 SB ' (1) ·
'JOG ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-5A ' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'US-92 ' (1) ·
'WB PGA Blvd. ' (1)
790071 (1) ·
790072 (1) ·
790114 (1) ·
790136 (1) ·
884028 (1) ·
890009 (1) ·
890083 (1) ·
930038 (1) ·
930106 (1) ·
930172 (1) ·
930173 (1) ·
930261 (1) ·
930262 (1) ·
930349 (1) ·
934295 (1) ·
934297 (1) ·
934408 (1)
'0.4 Mi W of I-95 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6Mi S of 707A ' (1) ·
'0.75 mile South of SR 708' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1MI W OF CR-615 ' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'CR 880 AT SIX MILE BEND ' (1) ·
'I-95 NB over US-92 ' (1) ·
'I-95 SB over US-92 ' (1) ·
'S of Southrn/Haverhll Int' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)