Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790008 (1) ·
790114 (1) ·
790135 (1) ·
790164 (1) ·
790165 (1) ·
790181 (1) ·
790199 (1) ·
790249 (1) ·
794042 (1) ·
794096 (1) ·
795001 (1)
'.75 MI. S. of US-92 ' (1) ·
'0.1Mi S of LPGA Blvd ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'1.4 miles North of US-92 ' (1) ·
'10ft. East of Nova Road ' (1) ·
'1200ft. N. of SR-400 ' (1) ·
'1400ft. N. of SR-400 ' (1) ·
'4.3 Mi North of SR-44 ' (1) ·
'40ft. E. of SR-5A ' (1) ·
'800ft. N. of SR-400 ' (1) ·
'SR-400 and Nova Rd. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 11 results in range #1 to #11.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)