Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930214 (1) ·
930285 (1) ·
930287 (1) ·
930289 (1) ·
930300 (1) ·
930301 (1) ·
930303 (1) ·
930304 (1) ·
930433 (1) ·
930434 (1) ·
934344 (1) ·
934461 (1) ·
934491 (1) ·
934914 (1) ·
935305 (1) ·
935306 (1)
'0.25MI E OF US 1 ' (1) ·
'0.2MI W OF I-95 ' (1) ·
'0.5MI. W OF I-95 ' (1) ·
'0.7 mile North of SR 804 ' (1) ·
'0.8Mi N OF BOYNTON BCH B ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1 mile West of US 1 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'100FT E OF SOUTH LAKE DR ' (1) ·
'150 FT E of SW 10TH ST ' (1) ·
'I 95 Exit 56 ' (1) ·
'Just West of I 95 ' (1) ·
'Over I 95 1 mi S of SR804' (1) ·
'W of I 95 on Woolbright ' (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)