Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Australian Ave and Canal' (1) ·
'Australian Avenue ' (1) ·
'Belvedere Rd to SB I-95 ' (1) ·
'CR 708 ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'DRAINAGE DITCH ' (1) ·
'Hanson Grant Outlet ' (1) ·
'I-95 Ramps & CSXRR ' (1) ·
'I-95 Rmp A C D G & CSXRR' (1) ·
'Mercer Ave./CSX RR/Canal' (1) ·
'NB I-95 to Belvedere Rd.' (1) ·
'Ramps A G & C.S.X. RR ' (1) ·
'Ramps A&G/BelvedereRd/RR' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'SR-91 (Fla's.Turnpike) ' (1)
'Belvede to NB I-95' (1) ·
'I 95 to PBIA Ramp ' (1) ·
'I-95 (SR-9) ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB I-95 to PBIA R ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PBIA Rp to NB I-95' (1) ·
'PBIA to I-95 Ramp ' (1) ·
'PBIA to SB I-95 ' (1) ·
'SB I 95 to SR 80 ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SB I-95 to PBIA ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR 80 to NB I-95 ' (1) ·
'SR-9(I-95) ' (1)
890117 (1) ·
890118 (1) ·
890121 (1) ·
890122 (1) ·
890123 (1) ·
890139 (1) ·
890144 (1) ·
930477 (1) ·
930478 (1) ·
930479 (1) ·
930480 (1) ·
930481 (1) ·
930482 (1) ·
930483 (1) ·
930484 (1) ·
930485 (1) ·
940111 (1) ·
940162 (1) ·
940163 (1)
'0.3 mile North of SR 80 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 MILES N OF CR-708 ' (1) ·
'2.5MI N OF INDIANTOWN RD ' (1) ·
'I-95 (2 mi. N. of SR-76) ' (1) ·
'I-95 over Midway Road ' (1) ·
'Just N. of Southern Blvd ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'North of Belvedere Rd ' (1) ·
'PBIA/I-95 Interchange ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)