Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Berry Avenue ' (1) ·
'HURON WAY ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NORFOLK BLVD. ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR 91 TPK 137.25 ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-714 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 SB TPK 134.32' (1) ·
'SR91 TPK 134.1 ' (1) ·
'SUNSET TRAIL ' (1)
890066 (1) ·
890067 (1) ·
890068 (1) ·
890070 (1) ·
890083 (1) ·
890085 (1) ·
890121 (1) ·
890122 (1) ·
890159 (1) ·
891000 (1) ·
894031 (1) ·
894047 (1) ·
894048 (1) ·
894054 (1)
'0.1 Mile S of CR-714 ' (1) ·
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'0.51MI SOUTH OF SR-714 ' (1) ·
'0.7MI WEST OF MAPP ROAD ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.6 MI NORTH OF SR-714 ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)