Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'DRAINAGE DITCH ' (1) ·
'E3 CANAL ' (1) ·
'Eau Gallie River ' (1) ·
'EL RIO CANAL ' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'GARDEN CANAL ' (1) ·
'L-5 CANAL ' (1) ·
'LOXAHATCHEE RIVER ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-4 (EL RIO) CANAL ' (1) ·
'Platt Ranch Access Road ' (1) ·
'RELIEF CANAL ' (1) ·
'SR-68 ' (1) ·
'Underhill Slough ' (1) ·
Zoo Trail (1)
'Becker Rd. ' (1) ·
'CAMINO REAL ' (1) ·
'CYPRESS WAY ' (1) ·
'JOG ROAD (NB) ' (1) ·
'Lake Harney Road ' (1) ·
'LAKE IDA ROAD ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NW 13 ST ' (1) ·
'NW 20TH ST WB ' (1) ·
'NW 20TH ST. EB ' (1) ·
'SE ISLAND WAY ROAD' (1) ·
'SR-9(I-95) ' (1) ·
'St. Johns Heritage' (1) ·
'Wickham Road ' (1) ·
Pineda Causeway (1)
700226 (1) ·
704190 (1) ·
704197 (1) ·
794050 (1) ·
890123 (1) ·
890144 (1) ·
894019 (1) ·
934272 (1) ·
934420 (1) ·
934421 (1) ·
934960 (1) ·
934964 (1) ·
935204 (1) ·
935215 (1) ·
937001 (1) ·
940097 (1) ·
941001 (1)
.1 Mi E of I-95 (1) ·
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.2MI E of LOXAHATCHEE RD' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3M W of ALT A1A(SR-811)' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.5MI W of N DIXIE HWY ' (1) ·
'0.5MI W of N DIXIE HIGHWY' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'2 MILES N OF CR-708 ' (1) ·
'2.5MI N OF INDIANTOWN RD ' (1) ·
'2.9 Miles South of US-192' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'CR-509 .5 Mi N of SR-518 ' (1) ·
'Just North of SR70 on I95' (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)