Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Heron Blvd. ' (1) ·
'SR 91 TPK 120.25 ' (1) ·
'SR-710 ' (1) ·
'SR91 N/S TPK 107.8' (1) ·
'SR91 N/S TPK 123.9' (1) ·
'SR91 N/S TPK 125.2' (1) ·
'SR91 N/S TPK 125.9' (1) ·
'SR91 N/S TPK 127.3' (1) ·
'SR91 N/S TPK 127.9' (1) ·
'SR91 N/S TPK 148.2' (1) ·
'SR91 NB TPK 144.6 ' (1) ·
'SR91 SB TPK 144.6 ' (1) ·
'SR91SB ON/OFF 98.0' (1)
890073 (1) ·
890074 (1) ·
890075 (1) ·
890076 (1) ·
890077 (1) ·
890078 (1) ·
930121 (1) ·
930146 (1) ·
930523 (1) ·
931005 (1) ·
940104 (1) ·
940105 (1) ·
941000 (1)
'0.25MI SOUTH OF SR-708 ' (1) ·
'0.45MI NORTH OF SR-708 ' (1) ·
'0.5mi East of SR-786 ' (1) ·
'0.6 MI N OF NO LAKE BLVD ' (1) ·
'0.6mi East of Congress Av' (1) ·
'0.74 MI N OF ST LUCIE BLV' (1) ·
'1.8MI NORTH OF SR-708 ' (1) ·
'2.2 MI SOUTH OF SR-76 ' (1) ·
'2.5MI NORTH OF CO LINE ' (1) ·
'500' N OF SR-80 (S.BLVD) ' (1) ·
'6 MI N OF PLM BEACH CO LI' (1) ·
'6.2 MI N OF ST LUCIE BLVD' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)