Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > Length 049:
8
& Culvert 062:
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting.
Use the filters below to narrow your results.
'10th Street ' (1) ·
'AIROSO BLVD. ' (1) ·
'Berry Avenue ' (1) ·
'CR-606 (Oslo Rd) ' (1) ·
'CR-713 ' (1) ·
'CR-722 (COVE RD) ' (1) ·
'CR519 (Fiske Blvd)' (1) ·
'Gradick Drive ' (1) ·
'I-95 ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Okeechobee Rd. ' (1) ·
'SR-40 ' (1) ·
'SR-44 ' (1) ·
'SR91 N/S TPK 125.9' (1) ·
'SR91 N/S TPK 154.3' (1)
700064 (1) ·
700065 (1) ·
704096 (1) ·
704101 (1) ·
790179 (1) ·
790182 (1) ·
790214 (1) ·
790215 (1) ·
790245 (1) ·
790246 (1) ·
884080 (1) ·
890011 (1) ·
890012 (1) ·
890076 (1) ·
894009 (1) ·
894054 (1) ·
940028 (1) ·
940110 (1) ·
944013 (1)
'0.1 Mile East of A1A ' (1) ·
'0.1 Mile S of CR-714 ' (1) ·
'0.1 mile S of I-95 ' (1) ·
'0.2MI SOUTH OF CR-714 ' (1) ·
'0.2mi. S of Williamson Rd' (1) ·
'0.2Mi. W of Valkaria Rd. ' (1) ·
'0.45MI NORTH OF SR-708 ' (1) ·
'0.5Mi E of A1A ' (1) ·
'0.6Mi W of US-1 ' (1) ·
'0.8 Mi North of SR-46 ' (1) ·
'1.2 MI NORTH OF SR-70 ' (1) ·
'1.3 miles east of I-95 ' (1) ·
'1.6MI Nof PT ST LUCIE BLD' (1) ·
'10thSt 1 Block E of Nova ' (1) ·
'2.3 MI N of SR-46 ' (1) ·
'2.45 mi. E of I-4 ' (1) ·
'2.59 mi. E. of I-4 ' (1) ·
'SR-40 west of SR-5A ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)