Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'El Rio Canal E-4 ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River ' (1) ·
'Indian River Relief ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-14 Cnl ' (1) ·
'S. Fork St. Lucie River ' (1)
'10TH AVE NORTH ' (1) ·
'E Gateway Blvd ' (1) ·
'Haverhill Rd ' (1) ·
'Kings Highway ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-510 Wabasso Rd ' (1) ·
'SR-510(Wabasso Rd)' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-76 ' (1) ·
'SR510 Wabasso Road' (1) ·
'SR806 Atlantic Ave' (1)
880050 (1) ·
880051 (1) ·
880052 (1) ·
880053 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
934348 (1) ·
934359 (1) ·
940007 (1) ·
940143 (1)
'.25 mi East of I-95 ' (1) ·
'.5mi So. of St Lucie Blvd' (1) ·
'0.4MI S of Melaleuca Ln ' (1) ·
'0.5Mi East of US-1 ' (1) ·
'0.7Mi East of US-1 ' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1.2MI East of US-1 ' (1) ·
'1.4MI E OF US-1 ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'2.5 miles North of SR-706' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)