Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'57th Street ' (1) ·
'CORAL DRIVE ' (1) ·
'CR-505 ROSELAND RD' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'CYPRESS WAY ' (1) ·
'Fox Lake Rd. ' (1) ·
'Indian Rvrsd Pk Rd' (1) ·
'Investment Lane ' (1) ·
'Island Drive ' (1) ·
'LYONS ROAD ' (1) ·
'PARK AVE. W. ' (1) ·
'SR91 NB TPK 109.5 ' (1) ·
'W LAKE RD CR-717 ' (1)
700133 (1) ·
884019 (1) ·
884093 (1) ·
894063 (1) ·
931013 (1) ·
934162 (1) ·
934164 (1) ·
934505 (1) ·
934953 (1) ·
935204 (1) ·
935205 (1) ·
935301 (1) ·
936656 (1) ·
937367 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.1MI S of CAMINO GARDEN ' (1) ·
'0.1MI S OF OLD BOYNTON ' (1) ·
'0.25 Mi. West of SR-405 ' (1) ·
'0.2MI S of CAMINO GARDEN ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.3MI W OF ROYAL PALM BL ' (1) ·
'0.5 E of Military Trail ' (1) ·
'0.7MI N OF BOYNTON BCH BL' (1) ·
'1.7MI N OF CR-512 ' (1) ·
'1.8MI W OF SR-15 ' (1) ·
'At CR-615 (66th Ave.) ' (1) ·
'Indian Riverside Park ' (1) ·
'Palm Beach Garden Interch' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 14 results in range #1 to #14.