Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Boynton Canal C16 ' (1) ·
'C-23 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'FL. TPK. SR-91 ' (1) ·
'Header Canal ' (1) ·
'I-95 ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lake Washington Road ' (1) ·
'LAKE WORTH TRIBUTARY ' (1) ·
'LATERAL CANAL D ' (1) ·
'MOORES CREEK ' (1) ·
'Pine Street ' (1) ·
'SR-404 ' (1) ·
'SR-518 ' (1) ·
Lake Washington Road (1)
'74TH AVE. ' (1) ·
'CR-516 ' (1) ·
'FOREST HILL BLVD. ' (1) ·
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'IBIS WAY ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NORTH 2ND STREET ' (1) ·
'PGA Blvd. (SR 786)' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-415 ' (1) ·
'SR-528 EB ' (1) ·
'SR-528 WB ' (1) ·
'SR-808 Glades Road' (1) ·
'US-1 NB ' (1) ·
'US-1 SB ' (1) ·
'US1(SR5) ' (1) ·
'WB SR 70 ' (1) ·
I-95 SB (1)
700043 (1) ·
700075 (1) ·
700087 (1) ·
700122 (1) ·
700123 (1) ·
700141 (1) ·
700151 (1) ·
700188 (1) ·
700941 (1) ·
790035 (1) ·
884023 (1) ·
890110 (1) ·
890111 (1) ·
930001 (1) ·
930265 (1) ·
930325 (1) ·
934213 (1) ·
936801 (1) ·
940119 (1) ·
945000 (1)
'0.1MI WEST OF A1A ' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.7 Mi N of Boynton Bch ' (1) ·
'2mi. N of SR714 on I95 ' (1) ·
'2mi.N of SR714 on I95 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'AT 4TH STREET ' (1) ·
'AT SOUTHERN/FORESTHILINTR' (1) ·
'CR-516 over I-95 ' (1) ·
'I-95 NB -Lk Washington Rd' (1) ·
'I-95 NB SR-518 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'SR-415 - Lake Ashby Canal' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
'Tpk/PGA Blvd interchange ' (1) ·
'US-1 NB - SR-404 ' (1) ·
'US-1 SB - SR-404 ' (1) ·
I-95 SB -Lk Washington Rd (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)