Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Alamana Canal ' (1) ·
'CANAL L-20 ' (1) ·
'COLLIER CREEK ' (1) ·
'COLLIER WATERWAY ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'Deep Creek ' (1) ·
'E-1 Canal ' (1) ·
'E-3 Canal ' (1) ·
'El Rio Canal E-4 ' (1) ·
'HILLSBORO CANAL L-14 ' (1) ·
'HILLSBORO L-14 CANAL ' (1) ·
'SALERNO CREEK ' (1) ·
'SR-91 (FL TURNPIKE) ' (1)
'BARBER STREET ' (1) ·
'DIXIE HWY (A1A) ' (1) ·
'DUDA ROAD ' (1) ·
'ENGLAR DRIVE ' (1) ·
'FLEMING STREET ' (1) ·
'Forest Hill Blvd. ' (1) ·
'SE 7TH STREET ' (1) ·
'SR-415 ' (1) ·
'SR-808 (Glades Rd)' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'ST LUCIE W BLVD WB' (1)
790033 (1) ·
790034 (1) ·
885603 (1) ·
885604 (1) ·
885605 (1) ·
894041 (1) ·
930319 (1) ·
930401 (1) ·
934329 (1) ·
934519 (1) ·
935100 (1) ·
940058 (1) ·
940083 (1) ·
940951 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.3MI N of CR 512 ' (1) ·
'0.5 MI. E OF SR-80 ' (1) ·
'0.9MI W OF SCHUMANN RD ' (1) ·
'1.1MI N of CR 512 ' (1) ·
'1.4 miles east of I-95 ' (1) ·
'1.5mi E of Jog Rd. ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'ADJ. TO N. SIDE OF SR-880' (1) ·
'AT SALERNO ROAD AND A1A ' (1) ·
'SR-415 - Alamana Canal ' (1) ·
'SR-415 - Deep Creek ' (1) ·
'SR-808 at SR-7 Boca Raton' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)