Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'C-17 CANAL ' (1) ·
'CYPRESS CREEK #2 ' (1) ·
'HUNGRYLAND CANAL C-18 ' (1) ·
'Hypoluxo Rd. ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LOXAHATCHEE WPB CANAL ' (1) ·
'LWDD E-1 Canal ' (1) ·
'Misner Branch ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'Tillman Canal ' (1) ·
'Tomoka River ' (1)
'I-95 NB ' (1) ·
'I-95 SB ' (1) ·
'Lake Worth Road ' (1) ·
'Main Trail ' (1) ·
'PROSPERITY FARMS R' (1) ·
'SBI-95 to Hypoluxo' (1) ·
'SR-507 NB ' (1) ·
'SR91 N/S TPK 103.1' (1) ·
'SR91 N/S TPK 115.5' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'SR91 N/S TPK 119.1' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 157.9 ' (1)
700185 (1) ·
790077 (1) ·
790078 (1) ·
796000 (1) ·
890079 (1) ·
930235 (1) ·
930239 (1) ·
930241 (1) ·
930299 (1) ·
930413 (1) ·
934116 (1) ·
940049 (1) ·
940057 (1) ·
940073 (1) ·
940082 (1)
'0.2 MI S OF MARTIN CO LIN' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.8 Mile West of Nova Rd ' (1) ·
'1.0MI SOUTH OF SR-706 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.3 MI N OF PLM BCH CO LI' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'3.0 MI NORTH OF SR-704 ' (1) ·
'Hypoluxo Rd.-I95 intercha' (1) ·
'I-95 NB - Tomoka R. ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'Lake Worth Rd. at SR-7 ' (1) ·
'SR-507 NB - Tillman Canal' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)