Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700015 (1) ·
700052 (1) ·
700061 (1) ·
700087 (1) ·
700089 (1) ·
700108 (1) ·
700109 (1) ·
700127 (1) ·
700129 (1) ·
700137 (1) ·
700151 (1) ·
700153 (1) ·
700192 (1) ·
700196 (1) ·
700197 (1) ·
700198 (1) ·
700200 (1) ·
700217 (1) ·
700219 (1) ·
700220 (1)
'0.6 MILE WEST OF US-1 ' (1) ·
'Citrus Blvd - I-95 ' (1) ·
'I-95 NB - SR-520 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'SR 520 EB - Indian River ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-520 EB - Banana River ' (1) ·
'SR-520 EB-St. Johns River' (1) ·
'SR-520 WB - Banana River ' (1) ·
'SR-520 WB -St Johns River' (1) ·
'SR-528 EB - US-1& FECRR ' (1) ·
'SR-528 EB at I-95 ' (1) ·
'SR-528 EB over CR-515 ' (1) ·
'SR-528 EB over Pine St. ' (1) ·
'SR-528 WB - CR-515 ' (1) ·
'SR-528 WB at I-95 ' (1) ·
'SR-528 WB over Pine St. ' (1) ·
SR-520 - Banana River (1) ·
SR-520 - Indian River Relief (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)