Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'EB Martin Downs Bd' (1) ·
'EB SR - 714 ' (1) ·
'HURON WAY ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NORFOLK BLVD. ' (1) ·
'SB I-95 (SR-9 ) ' (1) ·
'SR 91 TPK SB 131.0' (1) ·
'SR-714 ' (1) ·
'SR-91 TPK NB 131.0' (1) ·
'SR91 N/S TPK 135.6' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'SR91 SB TPK 134.32' (1) ·
'WB Martin Downs Bd' (1) ·
'WB SR - 714 ' (1)
890038 (1) ·
890066 (1) ·
890068 (1) ·
890083 (1) ·
890085 (1) ·
890121 (1) ·
890122 (1) ·
890134 (1) ·
890135 (1) ·
890143 (1) ·
890159 (1) ·
891000 (1) ·
894047 (1) ·
894048 (1)
'0.1Mi E of ONTARIO DRIVE ' (1) ·
'0.1MI. E of KANNER HWY ' (1) ·
'1.3 MI N OF STUART INTRCH' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 N of SW KANNER HWY ' (1) ·
'2.5 mi East of TPK Exit ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'3.7 MI S. OF STUART INT. ' (1) ·
'3.7MI S/O STUART INT. ' (1) ·
'SR-714 East of Fla. Tpk. ' (1) ·
'SR-714 East of Fla. Tpke.' (1) ·
'STUART TPK INTERCHANGE ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)