Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930061 (1) ·
930446 (1) ·
934347 (1) ·
936261 (1) ·
936262 (1) ·
936263 (1) ·
936264 (1) ·
936654 (1) ·
936655 (1) ·
936656 (1)
'.1 Mile W of US-A1A ' (1) ·
'0.04Mi W OF A1A ' (1) ·
'0.04MI S OF FOREST HILL ' (1) ·
'0.2 MI W OF A1A ' (1) ·
'0.2MI WEST OF OF A1A ' (1) ·
'0.5 MI S of FOREST HILL ' (1) ·
'1 MI S OF FOREST HILL BVD' (1) ·
'1.7 MI S OF FOREST HILL ' (1) ·
'A1A 2.5km North of SR 804' (1) ·
'Just west of I-95 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 10 results in range #1 to #10.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)