Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'Belcher Canal (C-25) ' (1) ·
'BELCHER CANAL C-25 ' (1) ·
'C-17 CANAL ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CANAL C-17 ' (1) ·
'CANAL L-20 ' (1) ·
'Earman River (C-17) ' (1) ·
'Intracoastal Waterway ' (1) ·
'North Lake ' (1) ·
'NORTH PALM BCH WATERWAY ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-68 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-9 (I-95) ' (1) ·
'Tide Relief Canal ' (1)
'53RD STREET ' (1) ·
'EB North Lake Blvd' (1) ·
'Graham Road ' (1) ·
'Kings Highway ' (1) ·
'LIGHTHOUSE DRIVE ' (1) ·
'MINUTE MAID RD 165' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PARK AVE. W. ' (1) ·
'PROSPERITY FARMS R' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 158.6 ' (1) ·
'US-1 (SR-5) ' (1) ·
'WB N. Lake Blvd. ' (1)
930003 (1) ·
930004 (1) ·
930050 (1) ·
930195 (1) ·
930361 (1) ·
934116 (1) ·
934164 (1) ·
936550 (1) ·
940007 (1) ·
940058 (1) ·
940059 (1) ·
940060 (1) ·
940068 (1) ·
940083 (1) ·
940092 (1) ·
940093 (1) ·
940096 (1) ·
940097 (1) ·
940100 (1) ·
940152 (1) ·
940162 (1) ·
940163 (1)
'0.3MI E OF PROSPERITY FAR' (1) ·
'0.3MI N OF N. LAKE BLVD. ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'100FT N ANGLE RD CR-607A ' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'1mi. W of US-1. ' (1) ·
'1mi. West of US-1 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'A1A on Singer Island ' (1) ·
'Just North of SR-850 ' (1) ·
'Just North of SR70 on I95' (1)
26475062 (1) ·
26482760 (1) ·
26482851 (1) ·
26483005 (1) ·
26485165 (1) ·
26490288 (1) ·
26490902 (1) ·
26495569 (1) ·
27254533 (1) ·
27264995 (1) ·
27265100 (1) ·
27265210 (1) ·
27271705 (1) ·
27271802 (1) ·
27281041 (1) ·
27281046 (1) ·
27281242 (1) ·
27281411 (1) ·
27283927 (1) ·
27283929 (1) ·
27290688 (1) ·
27320060 (1)
80022456 (1) ·
80032135 (1) ·
80033671 (1) ·
80040089 (1) ·
80040198 (1) ·
80040599 (1) ·
80042484 (1) ·
80052450 (1) ·
80222800 (1) ·
80224257 (1) ·
80231656 (1) ·
80233690 (1) ·
80233991 (1) ·
80235637 (1) ·
80235639 (1) ·
80235687 (1) ·
80252971 (1) ·
80254109 (1) ·
80270210 (1) ·
80270308 (1) ·
80333288 (1) ·
80363628 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)