Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'11th St. Canal ' (1) ·
'C-15 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-3 Canal ' (1) ·
'C-51 CANAL ' (1) ·
'C-51/WEST PALM BCH CANAL' (1) ·
'Callalisa Creek ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'E-1 Canal ' (1) ·
'E-2-E Canal ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'KRUEGER CREEK ' (1) ·
'LWDD CANAL E-1 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'NORTH NEW RIVER CANAL ' (1) ·
'RCA CANAL ' (1) ·
'Reed Canal ' (1) ·
'RELIEF CANAL ' (1) ·
'WPB CANAL C-51 ' (1)
'10TH AVE NORTH ' (1) ·
'BIG BLUE TRACE ' (1) ·
'BINKS FOREST DRIVE' (1) ·
'CAMINO REAL ' (1) ·
'CLINT MOORE RD ' (1) ·
'CONGRESS AVE ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'HAVERHILL ROAD ' (1) ·
'KIRK ROAD ' (1) ·
'Lake Ida Road ' (1) ·
'LINTON BLVD. ' (1) ·
'Melaleuca Lane ' (1) ·
'NB I 95 SR 9 ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR-15 Main St. ' (1) ·
'SR-44 ' (1) ·
'SR-80 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'Stribling Way ' (1) ·
'US-1 ' (1)
790012 (1) ·
790013 (1) ·
790151 (1) ·
884065 (1) ·
890120 (1) ·
930029 (1) ·
930032 (1) ·
930322 (1) ·
930338 (1) ·
930386 (1) ·
930445 (1) ·
934139 (1) ·
934212 (1) ·
934256 (1) ·
934258 (1) ·
934293 (1) ·
934301 (1) ·
934348 (1) ·
934361 (1) ·
934751 (1) ·
934929 (1) ·
934960 (1) ·
934963 (1) ·
940152 (1)
'.2mi East of US-27 ' (1) ·
'0.2MI EAST OF US-1 (SR-5)' (1) ·
'0.3 mile South of SR 706 ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.7Mi S OF CR-702/45TH ST' (1) ·
'0.9MI W OF MILITARY TRAIL' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2MI E of SR-76 ' (1) ·
'300' E of FL Turnpike ' (1) ·
'At East Canal St. ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'AT US-441 (SOUTHERN BLVD)' (1) ·
'AT US-441 SR-7 ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-44 - Callalisa Creek ' (1) ·
'StriblingWay ovr E-1canal' (1) ·
'US-1 over 11th Canal ' (1) ·
'US-1 over Reed Canal ' (1)
26203857 (1) ·
26243117 (1) ·
26252840 (1) ·
26262317 (1) ·
26271298 (1) ·
26282306 (1) ·
26362838 (1) ·
26375277 (1) ·
26380939 (1) ·
26395130 (1) ·
26403700 (1) ·
26405365 (1) ·
26405713 (1) ·
26411023 (1) ·
26445836 (1) ·
26450216 (1) ·
26501410 (1) ·
26554700 (1) ·
27115100 (1) ·
27265100 (1) ·
27380220 (1) ·
29014444 (1) ·
29093065 (1) ·
29144436 (1)
80035475 (1) ·
80042035 (1) ·
80052073 (1) ·
80052320 (1) ·
80054960 (1) ·
80061380 (1) ·
80062196 (1) ·
80070375 (1) ·
80074621 (1) ·
80074938 (1) ·
80085650 (1) ·
80101847 (1) ·
80121251 (1) ·
80121322 (1) ·
80135670 (1) ·
80153155 (1) ·
80172828 (1) ·
80222800 (1) ·
80264868 (1) ·
80400416 (1) ·
80424470 (1) ·
80541414 (1) ·
80594278 (1) ·
81022971 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 24 results in range #1 to #24.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)