Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
ObjectID:
None (1) ·
24350 (1) ·
Atlantis (1) ·
Boca Raton (1) ·
Boynton Beach (1) ·
Delray Beach (1) ·
Fort Pierce (1) ·
Golf village (1) ·
Greenacres City (1) ·
Indialantic (1) ·
Jupiter (1) ·
Lake Worth (1) ·
Melbourne (1) ·
Merritt Island (1) ·
Micco (1) ·
Palm Bay (1) ·
Palm Beach (1) ·
Palm Beach Gardens (1) ·
Riviera Beach (1) ·
Royal Palm Beach village (1) ·
Stuart (1) ·
Vero Beach (1) ·
West Palm Beach (1)
'Banana River ' (1) ·
'C-15 Canal ' (1) ·
'C-18 Canal ' (1) ·
'C-37 Canal ' (1) ·
'C-51 Canal ' (1) ·
'Canoe Creek ' (1) ·
'Casa Mar Dr ' (1) ·
'Eau Gallie River ' (1) ·
'El Rio Canal ' (1) ·
'FL TPK (SR-91) ' (1) ·
'FL TPK SR-91 ' (1) ·
'I 95 SR 9 ' (1) ·
'I-4 ' (1) ·
'Indian River EastRelief ' (1) ·
'Lake Worth Lagoon ' (1) ·
'Lake Worth Relief ' (1) ·
'Lateral A Canal ' (1) ·
'Lateral B Canal ' (1) ·
'Lateral C Canal ' (1) ·
'Lateral H Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD E-2 W ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 Canal ' (1) ·
'LWDD E-4 Canal ' (1) ·
'LWDD E3 Canal ' (1) ·
'LWDD L30 Canal ' (1) ·
'M-1 CANAL ' (1) ·
'Mercer Ave and CSX RR ' (1) ·
'Okeechobee Waterway ' (1) ·
'Spruce Creek ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR-507 ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'Stub Canal & S.F.R.C. ' (1) ·
'Ten Mile Creek ' (1) ·
'Tillman Canal ' (1) ·
'Turnpike (SR-91) ' (1) ·
Sebastian River (1)
'16th St/College Ln' (1) ·
'45th Street CR-702' (1) ·
'53rd Street ' (1) ·
'Apollo Boulevard ' (1) ·
'Benoist Farms Rd ' (1) ·
'Blue Heron Blvd ' (1) ·
'Congress Avenue ' (1) ·
'CR-4009 ' (1) ·
'CR-606 Oslo Rd ' (1) ·
'CR-714 Indian St. ' (1) ·
'CRESTWOOD BLVD. N ' (1) ·
'EB SR 786 ' (1) ·
'Enterprise Rd. ' (1) ·
'Gateway Blvd. ' (1) ·
'Hagen Ranch Road ' (1) ·
'Hanley Rd. S 25th ' (1) ·
'Hypoluxo Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'Island Way ' (1) ·
'Jupiter Boulevard ' (1) ·
'Lantana Road ' (1) ·
'Lyons Rd ' (1) ·
'LYONS ROAD ' (1) ·
'Minton Road CR-509' (1) ·
'NB SR-9 (I-95) ' (1) ·
'Oslo Rd (CR-606) ' (1) ·
'Quantum Blvd. ' (1) ·
'Roebuck Road ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'Spanish River Blvd' (1) ·
'SR A1A ' (1) ·
'SR-507 ' (1) ·
'SR-520 ' (1) ·
'SR91 N/S TPK 117.5' (1) ·
'US-192 ' (1) ·
'WB US 98 SR 80 ' (1) ·
'Woolbright Road ' (1) ·
US-1 (1)
Number 008:
Location 009:
Latitude 016:
Longitude 017:
0 (1) ·
1000 (1) ·
10000 (1) ·
101000 (1) ·
10300 (1) ·
114500 (1) ·
12200 (1) ·
12533 (1) ·
15300 (1) ·
15700 (1) ·
15900 (1) ·
16747 (1) ·
17200 (1) ·
17982 (1) ·
18657 (1) ·
18700 (1) ·
19300 (1) ·
19700 (1) ·
20500 (1) ·
20647 (1) ·
21500 (1) ·
22000 (1) ·
22600 (1) ·
23500 (1) ·
25500 (1) ·
26500 (1) ·
27000 (1) ·
28250 (1) ·
2880 (1) ·
3000 (1) ·
37000 (1) ·
38250 (1) ·
44400 (1) ·
6042 (1) ·
6480 (1) ·
7200 (1) ·
7263 (1) ·
8929 (1) ·
9500 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1) ·
No noticeable or noteworthy deficiencies which affect the condition of the channel. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Future 114:
Showing below up to 41 results in range #1 to #41.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
T
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch
- Template:Bridge Data fetch