Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Becker Rd. ' (1) ·
'CAMINO REAL ' (1) ·
'CR-613 (58TH AVE.)' (1) ·
'CR-A1A(OCEAN BLVD)' (1) ·
'Lake Ida Road ' (1) ·
'Melaleuca Lane ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 91 TPK RMP 93.5' (1) ·
'SR91 N/S TPK 138.1' (1)
884065 (1) ·
890083 (1) ·
890120 (1) ·
930334 (1) ·
930499 (1) ·
930500 (1) ·
934361 (1) ·
934960 (1) ·
934963 (1) ·
940096 (1) ·
940097 (1) ·
940152 (1) ·
941001 (1)
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.3MI S OF SR-60 ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.5 miles South of SR 806' (1) ·
'1Mi E of CR809/Military T' (1) ·
'2MI E of SR-76 ' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'Just North of SR70 on I95' (1) ·
'LAKE WORTH INTERCHANGE ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)