Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'45th Street CR-702' (1) ·
'CR-714 Indian St. ' (1) ·
'EB Forest Hill Bld' (1) ·
'EB Spanish Rvr Bvd' (1) ·
'EB SR706 ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'SR-401 NB ' (1) ·
'SR-401 SB ' (1) ·
'SR-44 ' (1) ·
'SR-91TPK NBSB 97.4' (1) ·
'WB Forest Hill Bld' (1) ·
'WB Spanish River ' (1) ·
'WB SR 706 ' (1)
700030 (1) ·
700031 (1) ·
700117 (1) ·
790172 (1) ·
894062 (1) ·
930154 (1) ·
930226 (1) ·
930453 (1) ·
930454 (1) ·
930514 (1) ·
931004 (1) ·
934166 (1) ·
934349 (1) ·
934908 (1)
'0.1 MI West of SR-76 ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1.0 M West of Haverhill R' (1) ·
'1.7 mi. east of SR-7 ' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'4.3 MI NORTH OF SR-802 ' (1) ·
'EB SR800 .2mi West of A1A' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SR-401 NB - Barge Canal ' (1) ·
'SR-401 SB - Barge Canal ' (1) ·
'SR-44 - Indian River ' (1) ·
'WB SR800.2Mi west of US-1' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)