Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930535 (1) ·
930536 (1) ·
934254 (1) ·
934319 (1) ·
934942 (1) ·
935201 (1) ·
935207 (1) ·
937715 (1) ·
945251 (1) ·
945254 (1) ·
945255 (1)
'0.1Mi S OF CR812 LANTANA ' (1) ·
'0.2 Mi East of Australian' (1) ·
'0.2 MILE E OF SW 9TH AVE ' (1) ·
'0.2MI S OF FLORESTA DR ' (1) ·
'0.3MI E of CONGRESS AVE. ' (1) ·
'0.4 MILE S OF ROYAL PALM ' (1) ·
'0.5MI S OF OKEECHOBEE BLV' (1) ·
'0.5MI W OF NW ST JAMES DR' (1) ·
'1.6MI N OF GATLIN BLVD. ' (1) ·
'2 miles East of SR-786 ' (1) ·
'2 miles East of SR786 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 11 results in range #1 to #11.