Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
700034 (1) ·
700052 (1) ·
700054 (1) ·
700058 (1) ·
700059 (1) ·
700066 (1) ·
700102 (1) ·
700237 (1) ·
700941 (1) ·
790058 (1) ·
790062 (1) ·
790064 (1) ·
790071 (1) ·
790077 (1) ·
790080 (1) ·
790082 (1)
'4.5 Mi. N of SR-46 ' (1) ·
'Buffer Preserve Drive ' (1) ·
'I-95 SB - CR-5A ' (1) ·
'I-95 SB - SR-44 ' (1) ·
'I-95 SB - SR-442 ' (1) ·
'I-95 SB - SR-520 ' (1) ·
'I-95 SB - SR-524 ' (1) ·
'I-95 SB - Tomoka R. ' (1) ·
'I-95 SB over FECRR ' (1) ·
'I-95 SB over SR-406 ' (1) ·
'I-95 SB over SR-50 ' (1) ·
'I-95 SB over US-1 ' (1) ·
'I-95 SB over US-92 ' (1) ·
'I-95 SB SR-518 ' (1) ·
'I-95 SB- Tillman Canal ' (1) ·
'I-95 SB-Maytown Road ' (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Countermeasures have been installed to mitigate an existing problem with scour and to reduce the risk of bridge failure during a flood event. Instructions contained in a plan of action have been implemented to reduce the risk to users from a bridge failure during or immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)