Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'4th St. and Canal D ' (1) ·
'90th Ave. ' (1) ·
'Angle Rd - Belcher Canal' (1) ·
'CR 512 (Fellsmere Rd.) ' (1) ·
'CR 708 ' (1) ·
'Drainage Canal ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Gatlin Blvd ' (1) ·
'S. R. 714 ' (1) ·
'SR 60 ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'SR-91 (Fla's. Turnpike) ' (1) ·
'St. Lucie Canal ' (1) ·
'Ten Mile Creek ' (1)
880100 (1) ·
880101 (1) ·
880102 (1) ·
880105 (1) ·
890109 (1) ·
890118 (1) ·
890122 (1) ·
890130 (1) ·
890133 (1) ·
940087 (1) ·
940092 (1) ·
940109 (1) ·
940114 (1) ·
940123 (1) ·
940127 (1)
'.5 miles South of SR-70 ' (1) ·
'1 mi. N of Cnty Rd 708 ' (1) ·
'1.5 Mi N/O SW Kanner Hwy ' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1mi N of SR-76(Kanner Hw)' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.0 mi S of SR-60 ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'3.8Mi S of Brevard Cty L ' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'I-95 over SR-60 ' (1) ·
'NB I-95 / SR 714 ' (1) ·
'NB I-95 over CR 708 ' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)