Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR 708 ' (1) ·
'CSX RR ' (1) ·
'Cypress Creek ' (1) ·
'El Rio Canal E-4 ' (1) ·
'I 95 SR 9 ' (1) ·
'Indian River ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'OKEECHOBEE BLVD ' (1) ·
'S. Fork St. Lucie River ' (1) ·
'SR-91 (Fl. Tpk.) ' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1) ·
'US-17/92 ' (1)
'AUSTRALIAN AVE NB ' (1) ·
'AUSTRALIAN AVE SB ' (1) ·
'E Gateway Blvd ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'NB 1-95 (SR-9) ' (1) ·
'NB I-95 (SR-9) ' (1) ·
'SB I-95 (SR 9) ' (1) ·
'SB I-95 (SR-9) ' (1) ·
'SR-472 ' (1) ·
'SR-520 ' (1) ·
'SR-520 WB ' (1) ·
'SR-714 ' (1) ·
'SR-76 ' (1) ·
'SR806 Atlantic Ave' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1)
700061 (1) ·
700170 (1) ·
790055 (1) ·
890115 (1) ·
890116 (1) ·
890117 (1) ·
890118 (1) ·
890127 (1) ·
890159 (1) ·
930069 (1) ·
930433 (1) ·
930434 (1) ·
934275 (1) ·
934276 (1) ·
934925 (1) ·
934926 (1) ·
934938 (1) ·
934939 (1)
'.25 mi East of I-95 ' (1) ·
'0.5 mile E. of US-1 ' (1) ·
'0.5MI EAST OF I-95 ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.5 mile North of SR 804 ' (1) ·
'1.5 miles North of SR 804' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'2.5 miles North of SR-706' (1) ·
'Just W. of Congress Ave.' (1) ·
'NB I-95 over CR 708 ' (1) ·
'SB I-95 over CR 708 ' (1) ·
'SR 520 WB Indian River ' (1) ·
'SR-472 over US-17/92 ' (1) ·
'Turnpike at Stuart exit. ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)