Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'Canal ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'FLORIDA TURNPIKE SR-91 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'Miller Creek ' (1) ·
'RANGE LINE CANAL ' (1) ·
'SR 710 and CSX RR ' (1) ·
'SR 802 Lake Worth Rd ' (1) ·
'SR802 Lake Worth Rd ' (1) ·
'Trib to Spruce Creek ' (1) ·
'US-1 & FECRR ' (1) ·
'WARNER CREEK ' (1)
'CR-508 (69TH ST.) ' (1) ·
'CR-723 ' (1) ·
'E. CAMINO REAL ' (1) ·
'EB PGA Blvd. ' (1) ·
'Haverhill Rd ' (1) ·
'I 95 SR 9 NB ' (1) ·
'I 95 SR 9 SB ' (1) ·
'JOG ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SR-520 ' (1) ·
'SR-528 WB ' (1) ·
'SR91 N/S TPK 138.1' (1) ·
'Tomoka Farms Rd ' (1) ·
'US-92 ' (1) ·
'WB PGA Blvd. ' (1)
700014 (1) ·
700169 (1) ·
790114 (1) ·
794008 (1) ·
794045 (1) ·
884028 (1) ·
890009 (1) ·
890083 (1) ·
930106 (1) ·
930172 (1) ·
930173 (1) ·
930261 (1) ·
930262 (1) ·
930349 (1) ·
934295 (1) ·
934297 (1) ·
934408 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'0.6MI E OF US-1 ' (1) ·
'0.6Mi S of 707A ' (1) ·
'0.75 mile South of SR 708' (1) ·
'0.9 Mi North of CR-4118 ' (1) ·
'1.0M S OF OKEECHOBEE BLVD' (1) ·
'1.5 Mi East of I-95 ' (1) ·
'1000'W of SR5 & E ofSR811' (1) ·
'1MI W OF CR-615 ' (1) ·
'2 mi. N of Lantana Rd ' (1) ·
'2 mi. North of Lantana Rd' (1) ·
'3.4MI NORTH OF SR-714 ' (1) ·
'S of Southrn/Haverhll Int' (1) ·
'SR-528 WB - US-1 & FECRR ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.