Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL C-16 ' (1) ·
'C-15 CANAL ' (1) ·
'C-17 CANAL ' (1) ·
'C-51 CANAL ' (1) ·
'Canal L-14 ' (1) ·
'Clint Moore Road ' (1) ·
'E-3 Canal ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Haverhill Rd. & U Turns ' (1) ·
'I-95 ' (1) ·
'Jog Rd. & Turn Arounds ' (1) ·
'L-14 CANAL ' (1) ·
'LATERAL CANAL #38 ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'Melb Tillman Canal 37 ' (1) ·
'S. R. 7 & Return Ramps ' (1) ·
'SR 808 GLADES RD ' (1) ·
'SR 809 (Military Trail) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Summit Boulevard ' (1) ·
Indian River Relief East (1)
'45TH STREET ' (1) ·
'BELVEDERE ROAD ' (1) ·
'BIG BLUE TRACE ' (1) ·
'Boynton Bch Blvd. ' (1) ·
'CONGRESS AVE ' (1) ·
'Congress Ave. ' (1) ·
'JOG ROAD ' (1) ·
'Malabar Rd ' (1) ·
'Minton Rd. ' (1) ·
'NB I 95 SR 9 ' (1) ·
'Pineda Causeway ' (1) ·
'Port St. Lucie Bld' (1) ·
'SR 80-Southern Bvd' (1) ·
'SR 80/Southern Bld' (1) ·
'SR 80/Southern Bvd' (1) ·
'SR 91 TPK 79.75 ' (1) ·
'SR-91 (TPK) 78.7 ' (1) ·
'SR91 N/S TPK 75.92' (1) ·
'West Atlantic Ave.' (1) ·
SR-520 (1)
700196 (1) ·
700225 (1) ·
704143 (1) ·
705953 (1) ·
930163 (1) ·
930215 (1) ·
930240 (1) ·
930292 (1) ·
930416 (1) ·
930438 (1) ·
930457 (1) ·
930459 (1) ·
930525 (1) ·
930527 (1) ·
931000 (1) ·
934100 (1) ·
934212 (1) ·
934282 (1) ·
934315 (1) ·
934470 (1) ·
934491 (1) ·
940142 (1)
'0.1 mi E of Minton Rd ' (1) ·
'0.2 Mi. E OF I-95 ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'0.5 MILE WEST OF JOG RD ' (1) ·
'0.5 MILES WEST OF SR-809 ' (1) ·
'0.5Mi South of 6th Ave S ' (1) ·
'0.8 MI N of LANTANA ROAD ' (1) ·
'0.8Mi NORTH OF CR-804 ' (1) ·
'1/2 mile W of SR-809 ' (1) ·
'2 MI N OF GLADES RD/SR808' (1) ·
'2 miles west of Turnpike ' (1) ·
'2.0 MI SOUTH OF SR-806 ' (1) ·
'2.6 MI S of Wickham Rd. ' (1) ·
'AT SOUTHSIDE OF SR-80 ' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'E Jog Rd. & W SR 80 ' (1) ·
'East Tpk & West SR 809 ' (1) ·
'Minton Road-I-95 ' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR-91 FL TPK OVER SR-808 ' (1) ·
'SW quadrant PB Int Airprt' (1) ·
SR-520 - Indian River Relief (1)
26220464 (1) ·
26243201 (1) ·
26252638 (1) ·
26252844 (1) ·
26272749 (1) ·
26314057 (1) ·
26322160 (1) ·
26360932 (1) ·
26360954 (1) ·
26395750 (1) ·
26404100 (1) ·
26404380 (1) ·
26404970 (1) ·
26405365 (1) ·
26413216 (1) ·
26453191 (1) ·
27162224 (1) ·
27595668 (1) ·
28025656 (1) ·
28113278 (1) ·
28212382 (1)
80041480 (1) ·
80051756 (1) ·
80052230 (1) ·
80052654 (1) ·
80053227 (1) ·
80064300 (1) ·
80071400 (1) ·
80075082 (1) ·
80075210 (1) ·
80084280 (1) ·
80084953 (1) ·
80092158 (1) ·
80101495 (1) ·
80101701 (1) ·
80101799 (1) ·
80121090 (1) ·
80153155 (1) ·
80213032 (1) ·
80401656 (1) ·
80401800 (1) ·
80422723 (1) ·
80423456 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles by assessment, by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
122864 (1) ·
125788 (1) ·
130993 (1) ·
13132 (1) ·
137065 (1) ·
171592 (1) ·
185298 (1) ·
19258 (1) ·
199525 (1) ·
23943 (1) ·
28194 (1) ·
43375 (1) ·
44243 (1) ·
62460 (1) ·
63327 (1) ·
74605 (1) ·
75472 (1) ·
78700 (1) ·
79810 (1) ·
8000 (1) ·
93690 (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)