Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 CANAL ' (1) ·
'C-51 Canal ' (1) ·
'CANAL C-17 ' (1) ·
'CR 702 45th Street ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'CR-712 Midway Road ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'FECRR ' (1) ·
'SR 91 TPK ' (1) ·
'SR-513 ' (1) ·
'SR-806 Atlantic Ave ' (1) ·
'St. Sebastian River ' (1) ·
'US-92 ' (1)
'CONGRESS AVE ' (1) ·
'CR68 ORNG AV 156.1' (1) ·
'I 95 SR 9 ' (1) ·
'I-95 SB ' (1) ·
'Military Trail ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'PARK AVE. W. ' (1) ·
'SB I 95 SR 9 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'Sebastian Blvd EB ' (1) ·
'Sebastian Blvd WB ' (1) ·
'SR-404 EB ' (1) ·
'SR-404 WB ' (1) ·
'SR-405 EB ' (1) ·
'SR-405 WB ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR-91 TPK NS 81.77' (1) ·
'SR91 SB TPK 150.7 ' (1)
700002 (1) ·
700083 (1) ·
700103 (1) ·
700149 (1) ·
790071 (1) ·
884078 (1) ·
884079 (1) ·
930460 (1) ·
930499 (1) ·
930500 (1) ·
930520 (1) ·
931006 (1) ·
934164 (1) ·
934470 (1) ·
940056 (1) ·
940076 (1) ·
940111 (1) ·
940112 (1) ·
940951 (1)
'0.37MI N OF SR-712 ' (1) ·
'0.3MI W OF CONGRESS AVE ' (1) ·
'0.4MI S OF LINTON BLVD ' (1) ·
'1.5 miles South of SR 806' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2.8 MI East of I-95 ' (1) ·
'2.9 MI N OF SR-70 ' (1) ·
'5.1 MI SOUTH OF SR-804 ' (1) ·
'At Exit 74 ' (1) ·
'I-95 over Midway Road ' (1) ·
'I-95 SB over US-92 ' (1) ·
'SR-404 EB over SR-513 ' (1) ·
'SR-404 WB - SR-513 ' (1) ·
'SR-405 EB - FECRR ' (1) ·
'SR-405 WB - FECRR ' (1) ·
'SR-80 & Military Trail ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
12318 (1) ·
12839 (1) ·
14574 (1) ·
171592 (1) ·
181308 (1) ·
34960 (1) ·
36435 (1) ·
369555 (1) ·
42941 (1) ·
43375 (1) ·
4414 (1) ·
55954 (1) ·
74605 (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)