Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Blue Lake Equalizer ' (1) ·
'Cnl.Trib. to Turnbull Ck' (1) ·
'Cow Creek ' (1) ·
'I-4 ' (1) ·
'I-95 ' (1) ·
'Little Cow Creek ' (1) ·
'Little Haw Creek ' (1) ·
'Miller Creek ' (1) ·
'Reed Canal ' (1) ·
'Samsula Canal ' (1) ·
'Sweetwater Creek ' (1) ·
'Tomoka River ' (1) ·
'Tomoka River ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Tributary to Spruce Crk ' (1)
'Cow Creek Road ' (1) ·
'E. Minnesota Ave. ' (1) ·
'Hunting Camp Road ' (1) ·
'LPGA Blvd ' (1) ·
'Marsh Road ' (1) ·
'Maytown Road ' (1) ·
'Old Dixie Highway ' (1) ·
'Reed Ca Prk Ent Rd' (1) ·
'Samsula Drive ' (1) ·
'Tomoka Farms Rd ' (1) ·
'Tomoka Farms Rd. ' (1) ·
'US-92 EB ' (1) ·
'Williams Road ' (1)
790084 (1) ·
790097 (1) ·
790105 (1) ·
794007 (1) ·
794008 (1) ·
794014 (1) ·
794019 (1) ·
794032 (1) ·
794038 (1) ·
794061 (1) ·
794063 (1) ·
794067 (1) ·
794130 (1) ·
794184 (1) ·
794185 (1) ·
796500 (1)
'.7 mi S of Taylor Rd ' (1) ·
'0.1 Mi North of Taylor Rd' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.4 Mile West of I-95 ' (1) ·
'0.5Mi West of Kepler Rd. ' (1) ·
'0.6 mi North of Taylor Rd' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.9 mile North of CR-40A ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.1 miles North of US-92 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'8.3 miles East of SR-415 ' (1) ·
'Intrsect w Reed Canal Rd ' (1) ·
'Old Dixie Hwy over I-95 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1) ·
'US-92 EB -Tomoka River ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 16 results in range #1 to #16.