Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790023 (1) ·
790027 (1) ·
790155 (1) ·
790156 (1) ·
790157 (1) ·
790158 (1) ·
790159 (1) ·
790160 (1) ·
790161 (1) ·
790162 (1) ·
790163 (1) ·
790194 (1) ·
790195 (1) ·
790212 (1) ·
790217 (1) ·
790220 (1) ·
794009 (1)
'0.2 mi E of CR-415 ' (1) ·
'CR-4139 over I-4 ' (1) ·
'I-4 EB Ramp - I-95 ' (1) ·
'SR-40 EB - Tomoka River ' (1) ·
'SR-40 WB - Habitat Connec' (1) ·
'SR-40 WB -Tomoka River ' (1) ·
'SR-40EB - Habitat Connect' (1) ·
'SR-415 -St. Johns Relief ' (1) ·
'US-1 NB - Spruce Cr. S. ' (1) ·
'US-1 NB - Spruce Creek ' (1) ·
'US-1 NB over Rose Bay ' (1) ·
'US-1 SB - Spruce Creek ' (1) ·
'US-1 SB - Turnbull Creek ' (1) ·
'US-1 SB over Rose Bay ' (1) ·
'US-1 SB-Spruce Creek ' (1) ·
'US-1SB - Spruce Cr. S. ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)