Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790042 (1) ·
790053 (1) ·
790099 (1) ·
790100 (1) ·
790105 (1) ·
790166 (1) ·
790167 (1) ·
790190 (1) ·
790191 (1) ·
790211 (1) ·
790941 (1) ·
795701 (1)
'0.1mi E of Riverside Dr ' (1) ·
'Enterprise Rd. Over I-4 ' (1) ·
'I-4 EB - Dirksen Dr ' (1) ·
'I-4 EB - Padgett Creek ' (1) ·
'I-4 WB - Dirksen Drive ' (1) ·
'I-4 WB - Padgett Creek ' (1) ·
'Orange camp Rd. over I-4 ' (1) ·
'Saxon Blvd EB - I-4 ' (1) ·
'Saxon Blvd WB - I-4 ' (1) ·
'SR-472 EB over I-4 ' (1) ·
'SR-472 WB over I-4 ' (1) ·
'Tomoka Farms Rd - I-4 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 12 results in range #1 to #12.