Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'B19 Canal ' (1) ·
'Bulow Creek ' (1) ·
'Canal ' (1) ·
'Deep Ck. Diversion Cnl ' (1) ·
'Drainage Canal ' (1) ·
'I-95 ' (1) ·
'Lake Ashby Canal ' (1) ·
'Lake Gertie ' (1) ·
'Little Cow Creek ' (1) ·
'Little Tomoka River ' (1) ·
'Samsula Canal ' (1) ·
'Spruce Creek ' (1) ·
'Trib To Turnbull Creek ' (1) ·
'Turnbull Creek (East) ' (1) ·
'Turnbull Creek (West) ' (1) ·
'Underhill Slough ' (1)
'Cow Creek Road ' (1) ·
'CR-4009 ' (1) ·
'CR-92 EB ' (1) ·
'CR-92 WB ' (1) ·
'Dunn Avenue ' (1) ·
'Hunting Camp Road ' (1) ·
'Lake Ashby Road ' (1) ·
'Lake Harney Road ' (1) ·
'Madeline Avenue ' (1) ·
'Maytown Road ' (1) ·
'Old Dixie Highway ' (1) ·
'Pioneer Trail ' (1) ·
'Samsula Drive ' (1) ·
'Tymber Creek Road ' (1) ·
'Volco Road ' (1) ·
'Walter Boardman Ln' (1) ·
'Williams Road ' (1)
794050 (1) ·
794063 (1) ·
794118 (1) ·
794121 (1) ·
794123 (1) ·
794124 (1) ·
794126 (1) ·
794130 (1) ·
794131 (1) ·
794133 (1) ·
794139 (1) ·
794141 (1) ·
794146 (1) ·
794184 (1) ·
794185 (1) ·
794186 (1) ·
794188 (1) ·
794189 (1) ·
794193 (1) ·
794194 (1)
'0.2 Miles North of SR 40 ' (1) ·
'0.25 W of Turnbull Bay Rd' (1) ·
'0.4 Mi West of US 17-92 ' (1) ·
'0.4 Mile West of US 17-92' (1) ·
'0.6 Mi E of Williamson Bv' (1) ·
'0.6 Mile South of SR-442 ' (1) ·
'0.9 mi E of Old Dixie Hwy' (1) ·
'1 Mi So. of SR-421 ' (1) ·
'1.0 mi. S of SR-44 ' (1) ·
'1.3 miles East of CR-415 ' (1) ·
'1.3 miles South of SR-44 ' (1) ·
'2.0 MI N of US-92 on I-95' (1) ·
'200ft. East of SR-415 ' (1) ·
'3.0 Miles West of US-1 ' (1) ·
'3.3 Miles West of US-1 ' (1) ·
'3.5 miles East of SR-415 ' (1) ·
'4 Mi South of Maytown Rd.' (1) ·
'4.3 mi S of Wltr Brdmn Ln' (1) ·
'4.5 mi S of Wltr Brdmn Ln' (1) ·
'4.8 miles East of SR-415 ' (1)
Bank and embankment protection is severely undermined. River control devices have severe damage. Large deposits of debris are in the channel. (1) ·
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Large spalls, heavy scaling, wide cracks, considerable efflorescence or opened construction joint permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting. (1) ·
N/A (1) ·
Shrinkage cracks, light scaling and insignificant spalling which does not expose reinforcing steel. Insignificant damage caused by drift with no misalignment and not requiring corrective action. Some minor scouring has occured near curtain walls, wingwalls or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting. (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1) ·
Bridge with "unknown" foundation that has not been evaluated for scour. Until risk can be determined, a plan of action should be developed and implemented to reduce the risk to users from abridge failure during and immediately after a flood event. (1)
Showing below up to 20 results in range #1 to #20.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)