Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
790057 (1) ·
790094 (1) ·
790095 (1) ·
790114 (1) ·
790116 (1) ·
790117 (1) ·
790118 (1) ·
790119 (1) ·
790135 (1) ·
790136 (1) ·
790168 (1) ·
790180 (1) ·
790221 (1) ·
790249 (1) ·
794082 (1)
'.75 MI. S. of US-92 ' (1) ·
'0.4 Mi W of I-95 ' (1) ·
'0.6 Mi S of Flagler Co. ' (1) ·
'1.0 Mi N of SR-40 ' (1) ·
'1.4 Mi N of Brevard Co. ' (1) ·
'1.4 Mi N of SR-40 ' (1) ·
'3.0 miles North of SR-40 ' (1) ·
'400ft N of SCLRR on SR-5A' (1) ·
'40ft. E. of SR-5A ' (1) ·
'5.5 Mile West of I-95 ' (1) ·
'7.3 Mi N of US-17 ' (1) ·
'8th St West of SR-5A ' (1) ·
'N of Bellevue Overpass ' (1) ·
'New Smyrna Bch C.L. ' (1) ·
'SR-5A at 3rd St ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Showing below up to 15 results in range #1 to #15.