Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CR709 GLADES RD & FEC RR' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Long Creek ' (1) ·
'MOORES CREEK ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR-9 (I-95) ' (1) ·
'SR-91 (FL TURNPIKE) ' (1) ·
'Ten Mile Creek ' (1)
'EB Prt St Lucie Bd' (1) ·
'EB St. Lucie Blvd.' (1) ·
'NORTH 2ND STREET ' (1) ·
'SR A1A ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR70 WB Okeechobee' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'ST LUCIE W BLVD WB' (1) ·
'St Lucie West Blvd' (1) ·
'WB Prt St Lucie Bd' (1) ·
'WB SR-70 ' (1) ·
'WB St. Lucie Blvd.' (1)
940049 (1) ·
940076 (1) ·
940082 (1) ·
940084 (1) ·
940120 (1) ·
940121 (1) ·
940133 (1) ·
940136 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940145 (1) ·
940158 (1) ·
940951 (1) ·
945000 (1) ·
949901 (1)
'0.1MI W OF BAYSHORE BLVD.' (1) ·
'0.2 MI N OF ORANGE AVE. ' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'1mi. West of CR-613 ' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'3.9 mi. W of FL Turnpike ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR A1A FPL Nuc P Intake ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 16 results in range #1 to #16.