Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
bridge data > County 003:
Saint Lucie
& Service On 042a:
Highway - Pedestrian
& Superstructure 059:
Very Good
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'C-24 Canal ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FTPK & S Macedo Blvd. ' (1) ·
'LITTLE MUD CREEK ' (1) ·
'Long Creek ' (1) ·
'Moore's Creek ' (1) ·
'N Fork St. Lucie River ' (1) ·
'N. Fork St. Lucie River ' (1) ·
'Ten Mile Creek ' (1)
940085 (1) ·
940139 (1) ·
940140 (1) ·
940144 (1) ·
940145 (1) ·
940146 (1) ·
940147 (1) ·
940151 (1) ·
940152 (1) ·
940158 (1) ·
944016 (1) ·
944018 (1) ·
945274 (1)
'0.1Mi. E of Bayshore Blvd' (1) ·
'0.7 Mi. West of I-95 ' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1 mile North of SR-70 ' (1) ·
'1.1 Mile S of CR-611B ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.8mi. East of SR-91 ' (1) ·
'2mi. East of SR-91 ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 13 results in range #1 to #13.