Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'Belcher Canal (C-25) ' (1) ·
'CANAL L-20 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'COUNTY LINE CANAL C-23 ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Header Creek Canal ' (1) ·
'MOORES CREEK ' (1) ·
'NORTH FORK ST LUCIE RVR ' (1) ·
'Relief E.of North Bridge' (1) ·
'Rim Ditch Canal C-24 ' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-9 (I-95) ' (1) ·
'Ten Mile Creek ' (1)
'CR-712 (MIDWAY RD)' (1) ·
'EB SR 70 ' (1) ·
'Graham Road ' (1) ·
'INDIAN RIVER DRIVE' (1) ·
'NB SR-615 ' (1) ·
'RANGE LINERD CR609' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-615 ' (1) ·
'SR 70 EB ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-A1A ' (1) ·
'SR70 EB Okeechobee' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'SR91 SB TPK 158.6 ' (1)
940020 (1) ·
940026 (1) ·
940035 (1) ·
940046 (1) ·
940053 (1) ·
940057 (1) ·
940058 (1) ·
940073 (1) ·
940083 (1) ·
940100 (1) ·
940143 (1) ·
940146 (1) ·
940147 (1) ·
940148 (1) ·
940149 (1) ·
940154 (1) ·
940156 (1) ·
940157 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.1MI S of SEAWAY DR A1A ' (1) ·
'1.5 mi N of SR 68 ' (1) ·
'1.5 mi. N. of SR 68 ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'1MI W of US-1 ' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'1mi. west of CR-613 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2.53 MI NORTH OF SR-68 ' (1) ·
'3.9 MI W of FL Tpk SR 91 ' (1) ·
'7 MI W of FL TPK SR91 ' (1) ·
'A1A East of Ft. Pierce ' (1) ·
'AT MARTIN COUNTY LINE ' (1) ·
'FT PIERCE INTERCHANGE ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 18 results in range #1 to #18.