Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Angle Rd - Belcher Canal' (1) ·
'Angle Rd.- Belcher Canal' (1) ·
'CR 709 & FECRR ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR-712 Midway Road ' (1) ·
'Galiano Rd & C-24 Canal ' (1) ·
'Galiano Rd. & C-24 Canal' (1) ·
'Gatlin Blvd ' (1) ·
'SR-614 (Indrio Rd) ' (1) ·
'SR-68 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-713 (King Hwy) ' (1) ·
'SR-91 (FL TPK) ' (1) ·
'Ten Mile Creek ' (1)
940086 (1) ·
940087 (1) ·
940092 (1) ·
940093 (1) ·
940096 (1) ·
940097 (1) ·
940101 (1) ·
940102 (1) ·
940108 (1) ·
940109 (1) ·
940111 (1) ·
940112 (1) ·
940113 (1) ·
940114 (1) ·
940115 (1) ·
940116 (1) ·
940122 (1) ·
940123 (1) ·
940126 (1) ·
940127 (1) ·
940162 (1) ·
940163 (1)
'.5 miles South of SR-70 ' (1) ·
'.75 Mile South Midway Rd.' (1) ·
'1.5 Mi. S of SR-70 ' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2 mi. N of Gatlin Blvd. ' (1) ·
'2.5 mi. N of SR 70 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'4.3 m N of Martin Co Line' (1) ·
'I-95 over Midway Road ' (1) ·
'Just North of SR70 on I95' (1) ·
'NB I-95/SR-614(Indrio Rd)' (1) ·
'SB I-95/SR-614(INDRIO RD)' (1)
27155060 (1) ·
27155288 (1) ·
27171853 (1) ·
27172347 (1) ·
27211679 (1) ·
27211974 (1) ·
27222697 (1) ·
27222932 (1) ·
27234232 (1) ·
27234592 (1) ·
27240492 (1) ·
27241193 (1) ·
27245645 (1) ·
27245841 (1) ·
27264995 (1) ·
27265210 (1) ·
27271705 (1) ·
27271802 (1) ·
27281041 (1) ·
27281411 (1) ·
27311700 (1) ·
27311955 (1)
80231716 (1) ·
80231922 (1) ·
80231981 (1) ·
80232174 (1) ·
80233690 (1) ·
80233923 (1) ·
80233991 (1) ·
80234014 (1) ·
80235637 (1) ·
80235639 (1) ·
80243196 (1) ·
80243677 (1) ·
80244973 (1) ·
80245174 (1) ·
80251481 (1) ·
80251602 (1) ·
80251811 (1) ·
80252110 (1) ·
80252971 (1) ·
80254109 (1) ·
80270180 (1) ·
80270543 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 22 results in range #1 to #22.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)