Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'ANGLE RD & BELCHER CANAL' (1) ·
'Belcher Canal (C-25) ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CANAL L-20 ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'Header Canal ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK & CANAL ' (1) ·
'SR-68 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-9 (I-95) ' (1) ·
'SR-91 (Florida Turnpike)' (1)
'Kings Highway ' (1) ·
'MINUTE MAID RD 165' (1) ·
'NB SR-615 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'PICOS RD 154.90 ' (1) ·
'Port St. Lucie Bld' (1) ·
'RDBGH RD 170.14 ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR A1A ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 157.9 ' (1) ·
'SR91 NB TPK 158.6 ' (1) ·
'SR91 SB TPK 157.9 ' (1) ·
'St Lucie West Blvd' (1) ·
'WB SR 70 ' (1)
940003 (1) ·
940004 (1) ·
940007 (1) ·
940055 (1) ·
940057 (1) ·
940059 (1) ·
940060 (1) ·
940073 (1) ·
940083 (1) ·
940084 (1) ·
940085 (1) ·
940096 (1) ·
940101 (1) ·
940102 (1) ·
940119 (1) ·
940133 (1) ·
940142 (1) ·
940143 (1) ·
940148 (1) ·
940149 (1) ·
940152 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.16 MI S OF SR-68 ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1.83 MILES N OF SR-68 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2.5 MI NORTH OF SR-68 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'3.4 MI S INDIAN RIVER CO ' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'9.38 MI NORTH OF SR-68 ' (1) ·
'Just North of SR70 on I95' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
27162224 (1) ·
27184103 (1) ·
27204020 (1) ·
27205945 (1) ·
27211650 (1) ·
27214720 (1) ·
27222475 (1) ·
27245645 (1) ·
27245841 (1) ·
27255887 (1) ·
27265100 (1) ·
27265210 (1) ·
27281242 (1) ·
27281279 (1) ·
27281300 (1) ·
27283525 (1) ·
27283630 (1) ·
27283673 (1) ·
27283929 (1) ·
27290688 (1) ·
27320060 (1)
80142440 (1) ·
80143606 (1) ·
80144500 (1) ·
80145640 (1) ·
80205848 (1) ·
80205926 (1) ·
80213032 (1) ·
80222800 (1) ·
80231716 (1) ·
80231922 (1) ·
80233991 (1) ·
80235569 (1) ·
80235687 (1) ·
80245322 (1) ·
80250650 (1) ·
80263496 (1) ·
80263571 (1) ·
80270210 (1) ·
80295022 (1) ·
80333288 (1) ·
80363628 (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 21 results in range #1 to #21.