Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'Canal No. 1 ' (1) ·
'Canal No.1 ' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'Header Canal ' (1) ·
'SR-68 ' (1) ·
'SR-70 (Okeechobee Rd.) ' (1) ·
'SR-9 (I-95) ' (1) ·
'SR-91 (Florida Turnpike)' (1) ·
'Taylor Creek(C-25 Canal)' (1)
'Graham Road ' (1) ·
'Kings Highway ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB SR-615 ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'Port St. Lucie Bld' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SB SR- 615 ' (1) ·
'SB SR-9 ( I-95) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR A1A ' (1) ·
'SR-5 (U.S. 1) ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-A1A ' (1) ·
'St Lucie West Blvd' (1) ·
'WB SR 70 ' (1)
940003 (1) ·
940004 (1) ·
940007 (1) ·
940009 (1) ·
940084 (1) ·
940085 (1) ·
940096 (1) ·
940097 (1) ·
940100 (1) ·
940101 (1) ·
940102 (1) ·
940119 (1) ·
940133 (1) ·
940142 (1) ·
940143 (1) ·
940148 (1) ·
940149 (1) ·
940152 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.25mi N of SR-68 ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'2 mi N. of SR 68 ' (1) ·
'2 Mi. N. of SR 68 ' (1) ·
'2mi S of SR-68(Orange Av)' (1) ·
'5.5mi. S of SR70 / I-95 ' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'Just North of SR70 on I95' (1) ·
'Port St Lucie / FL TPK. ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)