Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'Belcher Canal (C-25) ' (1) ·
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'Canal 29 (5 mile creek) ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'F.P.F.W.C.D. Canal No. 1' (1) ·
'Florida Turnpike (SR-91)' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'Header Canal ' (1) ·
'SR 70 ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-68 ' (1) ·
'SR-9 (I-95) ' (1) ·
'TEN MILE CREEK ' (1)
'Becker Rd. ' (1) ·
'Graham Road ' (1) ·
'Kings Highway ' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'SB I-95 (S.R. 9) ' (1) ·
'SR 68 (Orange Ave)' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR A1A ' (1) ·
'SR-713 (Kings Hwy)' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'SR91 SB TPK 152.9 ' (1) ·
'WB SR 70 ' (1)
940003 (1) ·
940004 (1) ·
940007 (1) ·
940053 (1) ·
940072 (1) ·
940076 (1) ·
940084 (1) ·
940085 (1) ·
940096 (1) ·
940097 (1) ·
940100 (1) ·
940119 (1) ·
940121 (1) ·
940134 (1) ·
940143 (1) ·
940152 (1) ·
940951 (1) ·
941001 (1)
'.5mi So. of St Lucie Blvd' (1) ·
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.3 Mi. W of SE Bosko Dr ' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1 mi. east I-95 on SR 68 ' (1) ·
'1.5mi. N of SR-68 ' (1) ·
'1mi. N of SR-70/SR-9 ' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'7.0 mi. W of FL Turnpike ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'Just North of SR70 on I95' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for assessed or calculated scour conditions; field review indicates action is required to protect exposed foundations (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)