Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BIG MUD CREEK ' (1) ·
'BLIND CREEK ' (1) ·
'CR 712 (Midway Road) ' (1) ·
'CR709 GLADES RD & FEC RR' (1) ·
'FEC Railroad ' (1) ·
'FPL Nuc Plant Disc Canal' (1) ·
'FPL Nuc Plant Intake Cnl' (1) ·
'LITTLE MUD CREEK ' (1) ·
'RIM DITCH CANAL C-24 ' (1) ·
'SR 70 ' (1) ·
'SR 91 TPK ' (1) ·
'SR 91 TPK (ST LUCIE INT)' (1) ·
'SR 91 TPK(FT PIERCE INT)' (1) ·
'SR-713 (King Hwy) ' (1) ·
'TEN MILE CREEK ' (1)
'CR-707(Citrus Ave)' (1) ·
'CR712 MDWYRD 150.3' (1) ·
'NB I-95 (S.R. 9) ' (1) ·
'NB SR-9 (I-95) ' (1) ·
'SB SR-9 (I-95) ' (1) ·
'SR 91 TPK SB 153.2' (1) ·
'SR A1A ' (1) ·
'SR-91 NB TPK 150.7' (1) ·
'SR-A1A ' (1) ·
'SR91 N/S TPK 152.5' (1) ·
'SR91 NB TPK 142.2 ' (1) ·
'SR91 NB TPK 153.1 ' (1) ·
'SR91 SB TPK 142.2 ' (1) ·
'SR91 SB TPK 143.3 ' (1) ·
'SR91 SB TPK 150.7 ' (1) ·
'SR91 SB TPK 152.9 ' (1)
940003 (1) ·
940004 (1) ·
940047 (1) ·
940049 (1) ·
940050 (1) ·
940053 (1) ·
940072 (1) ·
940076 (1) ·
940082 (1) ·
940084 (1) ·
940085 (1) ·
940111 (1) ·
940121 (1) ·
940134 (1) ·
940135 (1) ·
940158 (1) ·
940162 (1) ·
940163 (1) ·
940951 (1)
'0.2 MI N OF ST LUCIE BLVD' (1) ·
'0.23 MI N FPL POWER PLANT' (1) ·
'0.37MI N OF SR-712 ' (1) ·
'0.5 MI SOUTH OF SR-70 ' (1) ·
'0.83 MI N FPL POWER PLANT' (1) ·
'1.2MI S PORT ST LUCIE BLV' (1) ·
'1.2MI S PORT ST LUCIE RMP' (1) ·
'1.5mi N of SR-68 ' (1) ·
'2.6 MI S OF FT PIER INTCH' (1) ·
'2.6 MI SOUTH OF SR-70 ' (1) ·
'2.6 MILES NORTH OF SR-709' (1) ·
'2.6 MILES NORTH OF SR-710' (1) ·
'Citrus Ave/FEC RR ' (1) ·
'FT PIERCE INTERCHANGE ' (1) ·
'I-95 over Midway Road ' (1) ·
'NORTH OF BLIND CREEK ' (1) ·
'SR A1A FPL Nuc P Intake ' (1) ·
'SR AIA FPL Nuc Plt Disc ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 19 results in range #1 to #19.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)