Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-18 Canal ' (1) ·
'CANAL E-4 ' (1) ·
'E-1 CANAL ' (1) ·
'E-3 Canal ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'El Rio Canal (E-4) ' (1) ·
'FL TPK SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'LATERAL CANAL #45 ' (1) ·
'LATERAL CANAL L-5 ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'RCA CANAL ' (1)
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'Indiantown Rd. ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'PALMETTO PARK RD. ' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR 794 (Yamato Rd)' (1) ·
'SR-15 Main St. ' (1) ·
'SR-808 Glades Road' (1) ·
'SR91 N/S TPK 76.17' (1) ·
'SR91 N/S TPK 96.55' (1) ·
'SUMMIT BLVD ' (1)
930015 (1) ·
930325 (1) ·
930338 (1) ·
930391 (1) ·
930412 (1) ·
930447 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934367 (1) ·
934499 (1) ·
934924 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1)
'.5 mi East of I-95 ' (1) ·
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.5 mile West of I-95 ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.76 MI SOUTH OF SR 80 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'At East Canal St. ' (1) ·
'E Congress Ave. & W I-95 ' (1) ·
'PALMETTO PK RD US-441 SR7' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-91 OVER LAT CANAL 45 ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for assessed or calculated scour condition. Scour is determined to be within the limits of footing or piles (Example B) by assessment (i.e.,bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge), by calculations or by installation of properly designed countermeasures (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1)
107570 (1) ·
113642 (1) ·
133595 (1) ·
15789 (1) ·
171592 (1) ·
18912 (1) ·
192590 (1) ·
20647 (1) ·
20994 (1) ·
25331 (1) ·
30015 (1) ·
31230 (1) ·
32618 (1) ·
36435 (1) ·
40773 (1) ·
51387 (1) ·
99763 (1)
Showing below up to 17 results in range #1 to #17.