Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'CANAL E-4 ' (1) ·
'E3 CANAL ' (1) ·
'E3-canal ' (1) ·
'EL RIO CANAL ' (1) ·
'FL TPK SR-91 ' (1) ·
'Hillsboro Canal L14 ' (1) ·
'I-95 (SR-9) ' (1) ·
'Intracoastal Waterway ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'LWDD E 3-1/2 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'M CANAL ' (1) ·
'RCA CANAL ' (1) ·
'SR-91 N/S TPK ' (1)
'CAMINO REAL ' (1) ·
'CONGRESS AVE ' (1) ·
'Hypoluxo Rd ' (1) ·
'LAKE IDA ROAD ' (1) ·
'Melaleuca Lane ' (1) ·
'NW 13 ST ' (1) ·
'PALMETTO PARK ROAD' (1) ·
'PROS. FARMS ROAD ' (1) ·
'SEACREST BLVD. ' (1) ·
'SR-15 Main St. ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'SUMMIT BLVD ' (1) ·
'US-1 (SR-5) ' (1) ·
'W/B S.R. 704 ' (1)
930004 (1) ·
930183 (1) ·
930338 (1) ·
931011 (1) ·
934139 (1) ·
934228 (1) ·
934258 (1) ·
934361 (1) ·
934367 (1) ·
934499 (1) ·
934908 (1) ·
934960 (1) ·
934964 (1) ·
934965 (1) ·
935215 (1)
'.7mi. E of Congress Ave. ' (1) ·
'0.03Mi E of NW 15TH AVE ' (1) ·
'0.3MI E OF CONGRESS ' (1) ·
'0.4 MI W of US-1 ' (1) ·
'0.4MI W OF HAVERHILL BLVD' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'0.7MI S OF 45TH STREET ' (1) ·
'0.8 MILE EAST OF US-1 ' (1) ·
'1 Mile South of SR-786 ' (1) ·
'1.1 MI E OF JOG ROAD ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.2 Mi. East of Lyons Rd.' (1) ·
'At East Canal St. ' (1) ·
'S SIDE OF RCA/MONET ROAD ' (1) ·
'SR-710 TPK Interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge is scour critical; bridge foundations determined to be unstable for assessed or calculated scour conditions: Scour within limits of footing or piles. Scour below spread-footing base or pile tips. (1) ·
Bridge not over waterway. (1)
Showing below up to 15 results in range #1 to #15.