Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'Cabana Colony Circle ' (1) ·
'FL. TURNPIKE ' (1) ·
'Fla. Turnpike & 2 canals' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-38 CANAL ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD L-30 CANAL ' (1) ·
'LWDD LATERAL 14 CANAL ' (1) ·
'N Fork Loxahatchee River' (1) ·
'SR-91 TPK-DRAINAGE CANAL' (1) ·
'SR-91 TPK/DRAINAGE CANAL' (1)
'CR-812 OCEAN AVE ' (1) ·
'HYPOLUXO ROAD EB ' (1) ·
'HYPOLUXO ROAD WB ' (1) ·
'JOG RD NB ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD NB ' (1) ·
'JOG ROAD SB ' (1) ·
'LYONS ROAD ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'Prosperity Farms R' (1) ·
'SW 18TH ST WB ' (1) ·
'SW 18TH ST. EB ' (1) ·
'TEQUESTA DRIVE ' (1) ·
'WB Forest Hill Bld' (1) ·
'YAMATO RD EB ' (1) ·
'YAMATO RD WB ' (1)
930514 (1) ·
934148 (1) ·
934149 (1) ·
934178 (1) ·
934313 (1) ·
934345 (1) ·
934346 (1) ·
934369 (1) ·
934925 (1) ·
934926 (1) ·
934938 (1) ·
934939 (1) ·
934945 (1) ·
934946 (1) ·
934951 (1) ·
934952 (1) ·
936776 (1)
'0.3 Mile East of US-1 ' (1) ·
'0.7MI N OF BOYNTON BEACH ' (1) ·
'0.8MI N OF LANTANA ROAD ' (1) ·
'0.8Mi. N of PGA Blvd. ' (1) ·
'0.9MI W OF POWERLINE RD ' (1) ·
'1.0MI W OF MILITARY TRAIL' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'1.7 miles east of SR 7 ' (1) ·
'1.9Mi S of WOOLBRIGHT ' (1) ·
'1MI S OF LINTON BLVD ' (1) ·
'2.9MI W OF MILITARY TRAIL' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations (including piles) on dry land well above flood water elevations. (1) ·
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)