Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C. Stanley Weaver Canal ' (1) ·
'CANAL E-4 ' (1) ·
'E-3 CANAL ' (1) ·
'G-370 East Inflow Canal ' (1) ·
'G-370 West Inflow Canal ' (1) ·
'I 95 SR 9 ' (1) ·
'INTRACOASTAL WATERWAY ' (1) ·
'L-30 CANAL ' (1) ·
'L-38 CANAL ' (1) ·
'LAKE MANGONIA CANAL ' (1) ·
'LWDD E-2W CANAL ' (1) ·
'LWDD E-4 CANAL ' (1) ·
'LWDD L-38 CANAL ' (1) ·
'LWDD LATERAL 30 CANAL ' (1) ·
'LWDD LATERAL 32 CANAL ' (1) ·
'SR-91 TPK & BOCA RIO RD.' (1) ·
'SR-91/TPK & BOCA RIO RD.' (1)
'CLINT MOORE RD. EB' (1) ·
'CONGRESS AVE NB ' (1) ·
'DONALD ROSS RD EB ' (1) ·
'DONALD ROSS RD WB ' (1) ·
'FLAVOR PICT ROAD ' (1) ·
'GATEWAY BLVD (EB) ' (1) ·
'JOG ROAD SB ' (1) ·
'MILITARY TR. NB ' (1) ·
'MILITARY TRAIL NB ' (1) ·
'MILITARY TRAIL SB ' (1) ·
'PALM B LAKE BVD WB' (1) ·
'PALMETTO PK RD(EB)' (1) ·
'PALMETTO PK RD(WB)' (1) ·
'SW 23 Ave Golf Rd ' (1) ·
'SW 23RD AVE. ' (1) ·
'US-27 (SR-25) NB ' (1) ·
'US-27 (SR-25) SB ' (1)
930302 (1) ·
930304 (1) ·
930512 (1) ·
930513 (1) ·
934160 (1) ·
934161 (1) ·
934224 (1) ·
934907 (1) ·
934909 (1) ·
934915 (1) ·
934918 (1) ·
934930 (1) ·
934933 (1) ·
934935 (1) ·
934937 (1) ·
934948 (1) ·
934967 (1) ·
935308 (1)
'0.2 MI S OF LAKE IDA ROAD' (1) ·
'0.25 MI. W OF I-95 ' (1) ·
'0.3MI E OF CONGRESS BLVD ' (1) ·
'0.5Mi WEST OF CR-809 ' (1) ·
'0.6Mi W OF AUSTRALIAN AVE' (1) ·
'0.7Mi N OF SR-804 ' (1) ·
'0.8 MI N OF LAKE IDA ROAD' (1) ·
'0.8MI WEST OF US-1 ' (1) ·
'0.9 MI N OF LAKE IDA ROAD' (1) ·
'1.9 Mile E of US441 ' (1) ·
'1MI N. of CLINT MOORE RD.' (1) ·
'1MI S. OF LINTON BLVD ' (1) ·
'2MI E of SR-7 US-441 ' (1) ·
'5 mi. N Broward Co. line ' (1) ·
'Over I 95 1 mi S of SR804' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)