Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'BOYNTON CANAL ' (1) ·
'C-17 Canal ' (1) ·
'C-18 Canal ' (1) ·
'CR 812 LANTANA RD ' (1) ·
'DRAINAGE CANAL ' (1) ·
'E-4 Canal ' (1) ·
'Intracoastal Waterway ' (1) ·
'L-5 CANAL ' (1) ·
'Little Lake Worth ' (1) ·
'LWDD E- 2W CANAL ' (1) ·
'LWDD E-2E Canal ' (1) ·
'LWDD E-3 CANAL ' (1) ·
'LWDD LAT. 38 CANAL ' (1) ·
'SR 811 & FEC RR ' (1) ·
'SR91 TPK (JUPITER INT) ' (1) ·
'Tide Relief Canal ' (1)
'CLINT MOORE RD WB ' (1) ·
'CLINT MOORE RD. WB' (1) ·
'CR-880 ' (1) ·
'EB SR706 ' (1) ·
'JOG ROAD (NB) ' (1) ·
'JOG ROAD (SB) ' (1) ·
'LE CHALET BLVD ' (1) ·
'LYONS ROAD ' (1) ·
'Old Boynton Road ' (1) ·
'SB I 95 SR 9 Ramp ' (1) ·
'SR A1A ' (1) ·
'SR-A1A ' (1) ·
'SR91 NB TPK 116.3 ' (1) ·
'SR91 NB TPK 91.26 ' (1) ·
'WB Blue Heron Blvd' (1) ·
'WB SR 706 ' (1) ·
'WB SR 786 ' (1)
930351 (1) ·
930361 (1) ·
930394 (1) ·
930453 (1) ·
930454 (1) ·
930467 (1) ·
930492 (1) ·
930546 (1) ·
931002 (1) ·
931012 (1) ·
934271 (1) ·
934272 (1) ·
934487 (1) ·
934913 (1) ·
934956 (1) ·
934966 (1) ·
934968 (1) ·
934981 (1)
'0.3 mi east of US 1 & PGA' (1) ·
'0.4Mi. East of Congress A' (1) ·
'0.6MI S of SOUTHERN BLVD ' (1) ·
'0.7MI N OF BOYNTON BH BL ' (1) ·
'0.8Mi W OF MILITARY TRAIL' (1) ·
'1 Mile East of I-95 ' (1) ·
'1.9 Mi E of US-441 ' (1) ·
'1.9 Miles East of US-441 ' (1) ·
'1MI N OF CLINT MOORE RD ' (1) ·
'1st overpass east of I-95' (1) ·
'2.1 M S OF LAKEWORTH INTR' (1) ·
'4.1Mi W OF SR-80 ' (1) ·
'A1A on Singer Island ' (1) ·
'Indiantown Rd./ICW ' (1) ·
'Indiantown Rd/ ICW ' (1) ·
'SR 706 to I 95 Ramp ' (1) ·
'SR 91 at Jupiter Interch ' (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 18 results in range #1 to #18.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)