Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930187 (1) ·
930198 (1) ·
930267 (1) ·
930268 (1) ·
930367 (1) ·
930441 (1) ·
930458 (1) ·
930503 (1) ·
930504 (1) ·
930804 (1)
'.5mi East US1 Lakeworth ' (1) ·
'0.8MI E OF I-95 ' (1) ·
'0.8MI EAST OF I-95 ' (1) ·
'1.1 mi. N of Broward line' (1) ·
'1.1mil N. of Broward line' (1) ·
'1.3mi South of 10th Ave N' (1) ·
'1.8 MI N OF PGA BLV/SR786' (1) ·
'14.8 Mi West of US-27 ' (1) ·
'I-95 SR 806 interchange ' (1) ·
'I-95/SR 806 interchange ' (1)
Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Showing below up to 10 results in range #1 to #10.