Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
930120 (1) ·
930251 (1) ·
930259 (1) ·
930325 (1) ·
930362 (1) ·
930517 (1) ·
930518 (1) ·
930521 (1) ·
934259 (1) ·
934930 (1) ·
934986 (1)
16000 (1) ·
171500 (1) ·
173000 (1) ·
236000 (1) ·
25170 (1) ·
34000 (1) ·
62000 (1) ·
7150 (1) ·
85750 (1)
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
107570 (1) ·
12405 (1) ·
148776 (1) ·
27760 (1) ·
297552 (1) ·
300155 (1) ·
31462 (1) ·
409460 (1) ·
58990 (1)
Showing below up to 11 results in range #1 to #11.