Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-51 Canal ' (1) ·
'FLORIDA TURNPIKE ' (1) ·
'Hidden Valley Canal C15 ' (1) ·
'L-10 Canal ' (1) ·
'L-12 Canal ' (1) ·
'LOXAHATCHEE CREEK ' (1) ·
'LWDD C-16 CANAL ' (1) ·
'Miami Canal L-25 ' (1) ·
'N Fork Loxahatchee River' (1) ·
'SFWMD C-15 CANAL ' (1) ·
'SR 882 Forest Hill Blvd ' (1) ·
'SR-91 N/S TPK ' (1) ·
'Summit Boulevard ' (1)
'Benoist Farms Rd ' (1) ·
'BRANT DR/CARL BOTT' (1) ·
'I 95 SR 9 ' (1) ·
'I 95 SR 9 SB ' (1) ·
'INDIANTOWN ROAD ' (1) ·
'Levee Road ' (1) ·
'LYONS ROAD ' (1) ·
'NB I 95 SR 9 ' (1) ·
'NORTHLAKE BLVD(EB)' (1) ·
'NORTHLAKE BLVD(WB)' (1) ·
'SEACREST BLVD. ' (1) ·
'SR91 On/Off Rmp106' (1) ·
'TEQUESTA DRIVE ' (1) ·
'US-1 (SR-5) ' (1) ·
'US-27/SR-80 NB ' (1) ·
'US-27/SR-80 SB ' (1)
930006 (1) ·
930291 (1) ·
930292 (1) ·
930294 (1) ·
930537 (1) ·
930538 (1) ·
930805 (1) ·
930806 (1) ·
931011 (1) ·
934142 (1) ·
934148 (1) ·
934149 (1) ·
934499 (1) ·
934711 (1) ·
934731 (1) ·
935501 (1) ·
936776 (1)
'.2MI S of LINDELL BLVD ' (1) ·
'0.6Mi NORTH OF SR-804 ' (1) ·
'1.2MI. W of US-1 ' (1) ·
'1.4 MILES WEST OF TPK ' (1) ·
'1.5MI W OF MILITARY TRAIL' (1) ·
'300FT East of CR-717 ' (1) ·
'4.0 MI NW OF US-441 ' (1) ·
'At John Stretch Park ' (1) ·
'Benoist Farms Rd at SR-80' (1) ·
'Between SR 80 and SR 882 ' (1) ·
'Between SR 882 and SR 80 ' (1) ·
'I-95 / SR 882 ' (1) ·
'LYONS ROAD SOUTH OF SR-80' (1) ·
'No. City Line Boca Raton ' (1) ·
'SR-710 TPK Interchange ' (1)
Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and brush restrict the channel. (1) ·
Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. (1) ·
Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. (1) ·
N/A (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
Showing below up to 17 results in range #1 to #17.