Drilldown: bridge data
From Indian River Lagoon Project
Choose a table:
- Event (169)
- News Link (111)
- Organization (18)
- Waterbody (27)
- bridge (13)
- bridge data (1468)
- definition (254)
- fips (487)
- repository (98)
- timeline (19)
- weblink (123)
Use the filters below to narrow your results.
'C-15 Canal ' (1) ·
'CR 782 Linton Blvd ' (1) ·
'E3-canal ' (1) ·
'I 95 SR 9 ' (1) ·
'Lake Ida Road ' (1) ·
'Palm Beach Lake Blvd ' (1) ·
'Palm Beach Lakes Blvd. ' (1) ·
'Palmetto Park Road ' (1) ·
'PGA Blvd SR 786 ' (1) ·
'SR 794 Yamato Rd ' (1) ·
'SR 806 (Atlantic Ave.) ' (1) ·
'WPB CANAL C-51 ' (1)
930188 (1) ·
930189 (1) ·
930201 (1) ·
930335 (1) ·
930445 (1) ·
930462 (1) ·
930495 (1) ·
930499 (1) ·
930504 (1) ·
930530 (1) ·
930531 (1) ·
930539 (1) ·
934361 (1) ·
934751 (1)
'1 mile North of SR 704 ' (1) ·
'1 mile S of Linton Blvd ' (1) ·
'1.1Mi W of Miltiary Trail' (1) ·
'1.5 miles South of SR 806' (1) ·
'1mi. N of North Lake Blvd' (1) ·
'AT SR-80 SOUTHERN BLVD ' (1) ·
'Boca Raton ' (1) ·
'E Congress Ave & N SR 806' (1) ·
'I-95/SR 806 interchange ' (1) ·
'Just North of Exit 48 ' (1) ·
'Just South of Exit 48 ' (1) ·
'SR 80 / I-95 Interchange ' (1)
101000 (1) ·
101541 (1) ·
102500 (1) ·
104500 (1) ·
106500 (1) ·
14600 (1) ·
28250 (1) ·
85750 (1) ·
90500 (1) ·
9900 (1)
Bridge foundations determined to be stable for the assessed or calculated scour condition. Scour is determined to be above top of footing (Example A) by assessment (i.e., bridge foundations are on rock formations that have been determined to resist scour within the service life of the bridge4), by calculation or by installation of properly designed countermeasures (1) ·
Bridge not over waterway. (1)
148776 (1) ·
157018 (1) ·
17176 (1) ·
175235 (1) ·
176174 (1) ·
177838 (1) ·
181308 (1) ·
184778 (1) ·
25331 (1) ·
49014 (1)
Showing below up to 14 results in range #1 to #14.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)